Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 22, 2022     45-14 Cabin doors and transparencies Step 1-4 Planearound Door Latch Step 1-4 - (4 hours) Category: Fuselage
Step 1 tapped the pins with metric tapper.
Step 2 created the pointers drilling a #40 hole on the tip to easy removal.
Step3 Used a vinyl tape to make the mark on the jamb easier to find.
Step 4 (bending the longer pin is not necessary as the planearound has a gearbox in the middle which makes the bending unnecessary
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.